Meanwhile, our products are manufactured according to high quality standards, and complying with the international advanced standard criteria.
Overview
Quick Details
- Applicable Industries:
-
Manufacturing Plant
- Brand Name:
-
OEM
- OEM Service:
-
Support
- Tolerance:
-
0.01-0.05mm or Customized
- Certification:
-
ISO9001, SGS
- Surface Treatment:
-
Sandblasting,Polishing,Anodize, Zinc,Nickel,Chrome,Plating, etc.
- Application:
-
Automobile,Medical Equipments,Electric Appliance,Hardware,etc.
- Our products are selling well in Chinese markets and some products sold in international markets are well received by Chinese and foreign clients at home and abroad. Dimension:
-
As Customers’ Request
- Equipment:
-
Milling/Lathe/Drilling/Four/Three Axis CNC Machining Center
- Drawing Format:
-
PRO/E, Auto CAD, Solid Works,IGS,UG, CAD/CAM/CAE
Supply Ability
- Supply Ability:
- 10000 Piece/Pieces per Month
Packaging & Delivery
- Port
- nb
-
Lead Time
: -
Quantity(Pieces) 1 – 500 >500 Est. Time(days) 30 To be negotiated
Online Customization
Product Name |
CNC processing technology non standard cnc machining turning stainless steel auto parts |
Product Type |
CNC turning, milling, drilling, grinding, wire EDM cutting etc. |
Our Services |
CNC Machining,Plastic Injection,Stamping,Die Casting,Silicone And Rubber,Aluminum Extrusion,Mould Making,etc |
Material |
Aluminum,Brass,Stainless Steel,Copper,Plastic,Wood,Silicone,Rubber,Or as per the customers’ requirements |
Surface Treatment |
Anodizing,Sandblasting,Painting,Powder coating,Plating,Silk Printing,Brushing,Polishing,Laser Engraving |
Dimension |
As customers’ request |
Service Project |
To provide production design, production and technical service, mould development and processing, etc |
Drawing Format |
PRO/E, Auto CAD, Solid Works,IGS,UG, CAD/CAM/CAE |
Testing Machine |
Digital Height Gauge, caliper, Coordinate measuring The computer then compares the output subassembly stack height to the distance between the housing bearing seats and calculates the shim pack required for the desired bearing endplay. Using the worm-gear centerline measurement, it shows assemblers how to distribute shims between the front and rear bearings to precisely center the gear in the housing. Measurement accuracy is ±0.001 in. Total cycIn our sales program we offer standard and wide-angle PTO drive shafts. Regarding the customers’ needs there are different sizes, lengths and safety elements (clutches) available.le time, excluding loading and unloading, is less than 20 sec.machine, projection machine, roughness tester, hardness tester and so on |
Industry used |
Machinery; heavy duty equipment; electronic device; Auto spare parts; optical telecommunication |
Packing |
Eco-friendly pp bag / EPE Foam /Carton boxes or wooden boxes |
Trial sample time |
7-10 days after confirmation |
Delivery time |
7-30 days after receive the pre-payments |
Payment Terms |
T/T,Western Union,Paypal |